Projects

A growing portfolio of contracted UK infrastructure.

Every VoltOs site starts with a signed customer agreement. Here's what's operational, under construction, and contracted across the portfolio.

94 MW
Total contracted capacity
188 MWh
Total contracted storage
4
Sites across England
2026–27
Commercial operation window
Operational

Site A — Midlands

24 MW / 48 MWh behind-the-meter BESS supporting a logistics and light-industrial park. Live since Q1 2026.

C&ILFPEaaS
Construction

Site B — North West

18 MW / 36 MWh supporting a commercial real estate portfolio, targeting COD in Q3 2026.

C&ILFPEaaS
Contracted

Site C — South East

32 MW / 64 MWh contracted with an industrial occupier, in design development. Targeting COD in Q2 2027.

C&ILFPEaaS
Contracted

Site D — Yorkshire

20 MW / 40 MWh contracted with a distribution centre developer. Targeting COD in Q4 2027.

C&ILFPEaaS
Read the full case study →

Example portfolio content — replace with verified project data and photography before launch.

VoltOs 20 MW battery storage site

Featured case study

20 MW / 40 MWh — a zero-capital upgrade to asset performance

Fully funded, built, owned and operated by VoltOs under a 10–15 year Energy Supply Agreement. Illustrative ≈£366k/yr net saving to the property owner, +£0.37M NOI uplift and ≈+£6.7M valuation impact — at zero capital outlay and zero performance risk.

Read the case study
VoltOs site branding and PPE

Site standards

Built to one consistent standard

Every VoltOs site — regardless of size or customer — is delivered to the same engineering, safety and branding standard, from container livery to PPE to construction hoarding.

See how we build